TL;DR: Cibes Lift UAE’s standard home elevator lead time is 3 to 6 months from factory order to delivery, including manufacturing and sea freight. Selected models can arrive in around 3 months. Limited ready-stock lifts may be delivered within one week. Installation is scheduled separately once the site is ready.
How long does a home elevator take from order to installation?
For most made-to-order Cibes home lifts in the UAE, the current lead time is approximately 3 to 6 months.
This period covers manufacturing and sea freight, followed by delivery to the customer’s property when the site is ready. Installation takes place afterwards.
The actual timeline depends on the lift model, its configuration, factory production schedule, shipping and site conditions.
What is included in the 3 to 6 months?
A home elevator project involves several stages, and it helps to understand which ones are included in the quoted lead time.
| Stage | What happens | Typical timing |
| Consultation and order confirmation | Site assessment, model selection, technical specifications and contract | Depends on the project |
| Manufacturing and sea freight | Lift production, factory checks, shipping and delivery arrangements | Included in the 3 to 6 months |
| Delivery | Transport to the property, or warehouse storage if the site is not ready | Normally within the quoted lead time |
| Installation and testing | On-site assembly, electrical setup, safety checks and handover | Separate from delivery |
The 3 to 6 month period begins when Cibes UAE places the approved order with the factory after receiving the deposit.
It does not automatically begin on the day of your first enquiry or the day you sign the contract.
How much time should you allow for installation?
Installation time is separate from the manufacturing and delivery period.
For Cibes lifts, typical UAE installation durations are:
| Number of stops | Typical installation duration |
| 2 stops | 5 to 10 days |
| 3 stops | 8 to 15 days |
| 4 stops | 12 to 20 days |
| 5 stops or more | 15 days or longer |
These estimates apply after the lift materials reach the site and the required preparations have been completed.
For example, if you order a two-stop Cibes lift with a four-month delivery lead time, you should also allow approximately 5 to 10 days for installation once the site is ready.
That does not include any outstanding construction work or approvals.
For a more detailed breakdown, read our guide to home lift installation time in the UAE.
What happens after you order a Cibes home lift?
Ordering a home elevator is different from buying a finished appliance.
The lift must suit your available space, the height between floors, the people who will use it and your preferred design.
This is why Cibes UAE confirms the technical specifications before submitting the factory order.
When does the factory order officially begin?
The process normally starts with a consultation, quotation and agreement on the proposed lift.
Before the factory order, the Cibes UAE team works with you to finalise the technical and design requirements.
This includes checking the installation location, available dimensions, travel height, door arrangements and selected finishes.
The final site check can take place while the deposit is being arranged. Some design discussions may also happen during this period.
Once the contract has been signed, the deposit received and the specifications confirmed, Cibes UAE submits the order to the factory.
That factory order date marks the start of the quoted lead time.
You should confirm the estimated delivery date and approved specifications with your Cibes representative before production begins.
What happens during manufacturing and shipping?
Once the order reaches the factory, manufacturing proceeds according to the approved configuration.
Depending on the model, this may include manufacturing or preparing the lift’s structural components, drive system, doors, controls, shaft sections and selected finishes.
The components undergo factory quality checks and testing before dispatch.
Once ready, the lift is prepared for shipping to the UAE. The delivery schedule then depends on freight arrangements, transport and other logistics.
Cibes Lift Group’s international home lift buying guide explains that manufacturing times differ from the complete delivery period and that delivery depends on the destination country.
For UAE homeowners, the important figure is the combined manufacturing and delivery lead time, rather than the factory production time alone.
During this period, the UAE team coordinates delivery progress, site readiness and the expected installation schedule with the homeowner or contractor. This means the months before delivery are not simply a waiting period. They are also an opportunity to complete the work needed for installation.

Why do some home elevators take longer to deliver than others?
Two home lifts from the same manufacturer may have different lead times.
The difference can come from the model, technical requirements, selected finishes, factory production schedule and shipping arrangements.
A lift made for a compact two-storey villa may have a different configuration from a larger cabin lift serving several floors.
How does customization affect the manufacturing process?
A home lift is not designed around its appearance alone.
The most important decisions involve how the lift fits into your building and how you intend to use it.
For example:
- Lift dimensions: The overall size must fit the available space while providing enough room for passengers.
- Travel height and stops: The equipment must match the vertical distance and number of landing levels.
- Door arrangements: Each entrance must work with the floor layout and available circulation space.
- Finishes: Glass, colours, panels and other design details must match the approved specification.
Some Cibes models offer a wide range of sizes and finishes. This flexibility allows homeowners to select a lift that suits the actual property rather than settle for one standard configuration.
However, more specific requirements can also influence production scheduling.
The final price and specification are closely connected. Our guide to what determines home elevator cost in the UAE explains how size, travel height, doors and finishes affect the equipment required.
What happens if you change the specifications after ordering?
This is one of the most important parts of planning a home elevator.
Once the factory order has been submitted, changes are not always simple.
Whether Cibes can accommodate a change depends on the production stage and the components involved.
For example, increasing the lift’s travel height after the related parts have been manufactured may require additional or replacement components.
Changing door arrangements may affect the lift configuration. A different colour or finish may also create problems if those components are already in production.
Some changes can be accommodated. Others may introduce additional costs, affect the delivery date or require a revised factory order.
Cibes Lift Group makes the same point in its international buying guide:
“Once the order is approved, changes to the specification will increase the lift price and delay delivery.”
This is especially relevant if you’re ordering a lift while building or renovating a villa.
Floor levels, ceiling heights and interior layouts can still change during construction. If those changes affect the lift, the approved equipment may no longer match the site.
The best way to avoid costly modifications is to confirm the critical dimensions and design decisions before placing the factory order.
Can you get a home elevator delivered sooner in the UAE?
Yes. Not every Cibes home lift requires the full 3 to 6 month delivery period.
Cibes UAE also offers selected configurations with shorter lead times. Occasionally, ready-stock units are available for much faster delivery.
The important difference is how much flexibility you need in the lift’s dimensions, features and finishes.
Which Cibes models have shorter lead times?
Selected Cibes configurations can have an estimated delivery lead time of approximately 3 months, including manufacturing and sea freight.
These include:
Cibes V80 Rapido
Rapido is a faster-delivery configuration of the Cibes V80 platform lift.
It is offered in two predefined sizes with a single colour selection, rather than the wider range of configurations available with the standard made-to-order V80.
This makes it suitable for homeowners whose requirements match the available specifications.
X50 Rapido and X80 Rapido
Selected X50 and X80 configurations can also be supplied with an estimated lead time of around 3 months.
Their suitability depends on the lift requirements and the available configurations at the time of ordering.
These shorter lead times are indicative, not guaranteed for every order. Your Cibes representative must confirm current availability and delivery timing.
How quickly can a ready-stock home elevator be delivered?
In certain cases, Cibes UAE has ready-stock lifts physically available in the country.
When a suitable unit is available and the installation site is ready, delivery can take as little as one week.
However, ready-stock availability is currently very limited.
More importantly, an available lift must still fit your property.
Consider a ready-stock lift with the following specifications:
| Specification | Example ready-stock unit |
| Shaft size | 1400 × 1400 mm |
| Travel height | 5000 mm |
| Finish | Predetermined configuration |
| Door arrangement | Must be compatible with the property |
For this particular unit, your home must provide enough space for its shaft. The required travel height must also be within the unit’s supported configuration.
If your property has less available space or requires a greater travel height than the unit supports, the lift may not be suitable.
Door access, landing positions, headroom and other technical requirements must also be checked.
This is why ready stock should never be selected based on delivery speed alone.
A lift that arrives sooner but does not meet your requirements is not a practical solution.
For homeowners considering an existing property, our guide to retrofitting home lifts in UAE villas explains why the actual building conditions matter.
When should you order a home elevator during construction or renovation?
The best time to order is when the critical lift specifications are confirmed and the expected delivery date fits your construction schedule.
For a standard made-to-order Cibes lift, this usually means planning several months ahead.
You do not necessarily need to wait until the entire villa is finished.
In fact, waiting until the last stage of construction can create an unnecessary delay if the home is otherwise ready for occupancy.
But ordering before important dimensions have been confirmed introduces another risk: the building may change after manufacturing begins.
What site preparation should be completed before delivery?
A typical Cibes Lift UAE contract covers manufacturing, supply and installation of the lift.
Civil works and other building preparation are generally outside this standard scope.
They can be arranged by the homeowner through a contractor or, where agreed, coordinated by Cibes through a third party at an additional contract cost.
Depending on the lift and building, site preparation may include:
- Preparing the floor openings, base or shallow pit.
- Confirming the electrical power supply.
- Completing necessary structural work.
- Providing clear access for delivery and installation.
- Confirming floor levels, landing access and overhead clearance.
- Obtaining relevant authority, community or building management approvals.
The exact work varies between new villas, occupied homes, duplex apartments and outdoor installations.
In Dubai, building modifications and additions can require formal approval. The Dubai Municipality building permit procedures explain the framework for residential construction, while the Dubai Development Authority’s building modification permit provides a specific example of requirements in areas under its jurisdiction. For the full site preparation and installation sequence, see our step-by-step guide to home lift installation in the UAE.

How can you avoid delays between ordering and installation?
The most useful approach is to plan backwards from when you want the lift ready.
For example, imagine you’re renovating a two-storey villa and expect to finish the main construction work in six months.
Rather than waiting until construction is almost complete, you can review the lift requirements early and coordinate the factory order with the expected site readiness date.
Here’s a practical process:
- Confirm the lift location and dimensions. Work with your architect or contractor to establish the available space, travel height, landings and door arrangement.
- Finalise the model and finishes. Make sure the approved specification suits both the users and the property’s design.
- Confirm the delivery lead time. Ask Cibes UAE for the current estimate based on the selected model, rather than relying on a general timeline.
- Prepare the site during production and shipping. Coordinate civil works, electrical provisions, access and required approvals.
- Arrange delivery and installation. Have the site checked and confirm the installation schedule before the lift arrives.
There is another situation worth planning for.
What if the lift arrives before your home is ready?
If the site is still under construction, Cibes UAE may arrange to keep the lift in its warehouse until delivery becomes practical.
Storage may involve additional charges depending on the contract and storage arrangements.
This can prevent premature delivery, but it also means the lift has already arrived without being ready for installation.
The better approach is to coordinate the expected delivery and site readiness dates as closely as practical, while allowing some flexibility for construction or shipping delays.
Dubai’s active villa construction market makes this coordination relevant. According to Dubai Municipality’s August 2025 report, 1,484 villa completion certificates were issued in the first half of 2025. Whether you’re completing a new villa or renovating an existing one, decisions about technical equipment need to fit the wider building programme.
A home lift is a long-term part of your property. Getting the specification right before manufacturing is often more important than rushing the initial order.
Frequently asked questions about home elevator lead times
How long does it take to get a Cibes home elevator in Dubai or Abu Dhabi?
The typical made-to-order lead time is 3 to 6 months from the factory order to delivery, including manufacturing and sea freight. Selected models may arrive in around 3 months. Installation takes place separately after delivery and site preparation.
Does home elevator lead time include installation?
No. At Cibes Lift UAE, the quoted 3 to 6 month lead time covers manufacturing and delivery, not installation. The installation period depends on the model, number of stops and site conditions.
Can I get a home elevator delivered within one week?
It is possible when Cibes UAE has a suitable ready-stock unit available in the country. The lift must match the property’s dimensions and technical requirements, and the site must be ready. Ready-stock availability is very limited.
Can I change the lift color, size or travel height after placing an order?
Changes may be possible depending on the factory production stage. However, modifications can require additional components, extra cost or more time. You should finalize the main specifications before submitting the factory order.
Should I order a home elevator before my villa construction is finished?
Yes, you can order during construction once the critical measurements and specifications have been confirmed. With a normal delivery lead time of 3 to 6 months, early coordination can help prevent the lift from delaying your project’s completion.
What happens if my home isn’t ready when the lift arrives?
Cibes UAE may arrange warehouse storage until the property is ready for delivery and installation. Additional storage charges may apply depending on your agreement. Any outstanding civil works or site preparations must be completed before installation can begin.
Final thoughts
The time needed to get a home elevator is not just about how quickly a manufacturer can produce it.
It also depends on whether the lift has been correctly specified, how it reaches the UAE and whether your home is ready when it arrives.
At Cibes Lift UAE, our role as the local subsidiary of Cibes Lift Group is to help you select the right solution, coordinate the factory order and arrange installation according to your property’s requirements.
If you’re planning a home elevator for a new villa or an existing property, speak with our team early. We can assess the available space, discuss the available configurations and provide a delivery estimate based on your actual project.
Learn more about Cibes as a home elevator provider in the UAE or explore our home lift price guide to understand the costs involved.


Not sure which home lift fits your villa?
Share your floor plan with our team and get a tailored recommendation and quotation – no obligation.
About the Author